Eco Builds

We have improved the eco credentials of the old buildings and built some exciting new ones.

Before it was headline news we always tried to preserve our environment. We try to think of ways to continually improve and educate our customers & staff alike.

The Apple Store

Our environmental classroom and apple store

The Apple Store has been rebuilt near the vegetable gardens and is used as an environmental classroom as well as to store and press our apples for juice. It is a meeting place for the ‘Garden to Table’ activity and as well as the Sustainability tour where children are shown about sustainable building methods and materials, renewable energy sources and organic food production.

The Apple store was re-built by the MoB maintenance team in the winter of 2022.  We used the dismantled high ropes wooden poles as the main building structural posts. The walls have been woven from our home grown willow into hurdles and we are planning to finish them in the summer with a clay daub.

The build will use reclaimed double glazing, and a cob wall and a beautiful balcony looking out to the wood fired pizza oven and kitchen.

The Longhouse

The Longhouse was designed with the environment always at the forefront, in line with Mill on the Brue’s ethos. We wanted to make The Longhouse an environmental showcase for the south west of England.

Minimum foot print

The design has purposely minimised the amount of concrete used to cover its base for foundations. Instead a mixture of reinforced pillar foundations and where necessary, the conventional concrete flooring, means less impact on the overall area of the site.

Heat & insulation

  • The majority of the heat comes from geo-thermic heating (coils sunk 2m into the ground filled with diluted anti freeze) working exactly the same as a fridge. The heat is then transformed into to under floor heating.
  • In the winter months a highly efficient wood burner stove can provide extra heat fuelled by wood from Mill on the Brue – however because the building is so well insulated with sheeps wool and warm cell.
  • Double glazed Pilkington K glass has been used.

Water management

The build incorporated a 27,500 litre rain water storage tank. The water is pumped up to the building to flush all the lavatories. All have half and full flush facility.

Solar energy

  • The 85kw PV array is linked up to The Longhouse as this building uses the highest amount of electricity.
  • The south facing side is predominately glass maximising the passive solar gain.
  • Solar thermal panels provide around 60% of the annual hot water for our kitchen and loos within the Longhouse.

Materials used:

  • Re-cycled rubber tyre slates used for the entire roof.
  • Sheeps wool insulation.
  • Warmcell recycled newspaper insulation.
  • Locally sourced sustainable wood for the majority of the wood used.
  • Doubled glazed doors and windows.
    Chemical free paint.

Local Architect and Tradesmen

Bruton based architect and building company employing local sub contractors.

Rivermead House

Rivermead House was completed in 2021 with 35 pupils beds and 3 teachers bedrooms.

Solar Panels

In September 2024 we installed a 8kw with battery that now produces 58% of the total annual electricity and surplus electricity heats the water tank.

Heat & insulation

  • The new wing was made from Insulated Concrete Form that is a highly insulated building.
  • The both houses have double glazing and highly levels of insulation.

Local Architect and Tradesmen

Bruton based architect and building company employing local sub contractors.